1. Home
  2. Uccle
  3. Renovation contractor Uccle
02 886 08 80/Price stated before the call-out
FUSE SERVICES8 trades. One team.
Uccle · Région de Bruxelles-Capitale

Bathroom to renovateKitchen to redoWalls to replasterFloor to lay? One team.

A flat to refresh or a house to take on in Uccle: the Belgian market ranges are published below, your quote is written before the first hammer blow, and it holds.

ITEMISED QUOTE before the first hammer blow8 TRADES one team, one scheduleCHANGES priced before they are made6 % VAT homes over 10 years old
  • VAT BE 1027.949.184
  • Free quote
  • Seat: Drogenbos
  • FR · NL · EN
DispatchSector: Uccle (1180)

--:--Brussels time ·

StatusTeam reachable by phone
TimingTime slot and price confirmed by phone before the technician leaves
Request a call back

RenovationUccle · 1180
Emergency

Renovation contractor in Uccle: bathroom to renovate? One team.

  1. 01Call
  2. 02Diagnosis on the phone
  3. 03Call-out
01 — Scope

What we do at your place

One technician comes to Uccle, one itemised invoice.

A renovation in Uccle rarely goes wrong because of the price of the tiles. It goes wrong because the plumber waits for the electrician, the plasterer comes back three times, and every surprise becomes a vague variation order. Our method is built against that. The quote is written item by item: demolition, waste removal, plumbing, electrics, plastering, tiling, painting, each with its quantity and price. The schedule is held by one team that practises all 8 trades, so one trade does not wait for another. When a surprise appears, a hollow screed or a non-compliant cable, it is photographed, priced and approved by you before work continues. VAT is 6 % if your home in Uccle is over 10 years old. The table below gives 2026 Belgian market ranges, item by item, so you can place our quote.

01

Complete bathroom

Demolition, water and drainage runs, wet-zone electrics, waterproofing, tiling, sanitary fittings installed, painting. One quote, one team, one schedule.

02

Partitions and openings

Partition demolition, new stud-and-board partition, opening in a load-bearing wall with a steel beam and prior structural check. Rubble removal included.

03

Plastering and skimming

Re-plastering over old plaster, skimming, ceilings, protected corners, crack treatment. Surface prepared for paint, dust contained.

04

Floors and tiling

Screed, porcelain tiling, parquet or vinyl, skirting. Level and flatness checked before laying, layout shown before fixing.

05

Painting and finishes

Surface preparation, two coats, ceilings, woodwork, interior doors. The quote states the area, the number of coats and the paint grade.

06

Integrated services

Plumbing, electrics and heating included in the same quote and by the same team: no subcontractor to wait for, no patching between two trades.

02 — Method

Four steps, no surprises

The price is fixed on the phone before the technician sets off for Uccle. After that it does not change without your consent.

1

You call

You describe the project and the rooms involved. We set a survey appointment and indicate the market range for this type of work.

On-site survey free of charge
2

Survey and itemised quote

Measurements, photos, test openings where needed. The quote lists each item with quantity, unit price and total, and separates the essential from the comfort.

Written quote before works
3

Works by a single team

Schedule handed over, trade sequence held by the same team. Any surprise is photographed, priced and approved by you before work continues.

Surprise = prior agreement
4

Handover and invoice

Room-by-room handover with you, snags noted and cleared. Invoicing per completed stage, VAT at 6 % or 21 % shown, written guarantee.

Invoicing per stage
03 — On the ground

Uccle: what changes on site

Uccle, postcode 1180, Région de Bruxelles-Capitale. One page per municipality, with its neighbours and distances.

Uccle is one of the municipalities we visit regularly. The price stated for Uccle is the price on the invoice, no more, no less.

5 km Forest 1.4 kmSaint-Gilles 3.1 kmAnderlecht 4.0 kmIxelles 4.0 kmBrussels 4.9 kmEtterbeek 5.2 kmMolenbeek-Saint-Jean 5.7 kmSaint-Josse-ten-Noode 5.9 km Uccle
Local sheet1180 · Région de Bruxelles-Capitale

Neighbouring municipalities of Uccle we cover

Local sheet

Postcode
1180
Region
Région de Bruxelles-Capitale
Brussels centre
4.9 km as the crow flies

Neighbouring municipalities of Uccle we cover

Forest
1.4 km
Saint-Gilles
3.1 km
Anderlecht
4.0 km
Ixelles
4.0 km
Brussels
4.9 km
Etterbeek
5.2 km
04 — Estimate

Your price range in 20 seconds

Two choices and you have an order of magnitude excluding VAT, without leaving your number. Belgian market ranges, not our own price list.

Time of the job
Access
Preliminary quoteEstimate for Uccle

Estimated range · excl. VAT

incl. 6 % VAT
incl. 21 % VAT

6 %: private dwelling over ten years old, works with parts fitted. Otherwise 21 %.

Indicative estimate excluding VAT based on 2026 Belgian market ranges; per-m² items are converted for a typical room. The actual quote is drawn up item by item after an on-site survey.

05 — Questions

Your questions before we arrive

What people in Uccle ask before confirming.

Can the quote change once the works have started?
The items on the quote do not change. What can be added is a surprise the survey could not see: a hollow screed, a lead pipe, a non-compliant cable behind a wall. It is then photographed, priced and you accept it in writing before work continues. You can also decline and choose another solution. See the prices
How long does a bathroom renovation take?
The schedule is written into the quote, with start and end dates per stage. The duration depends on the floor area, the state of the pipework and the drying times of waterproofing and screed, which cannot be compressed. Because the same team does plumbing, electrics, tiling and painting, no week is lost between two trades. Request a quote
What guarantee covers renovation work?
Materials fall under the two-year legal conformity guarantee; the works are covered by the contractor's liability under the Belgian Civil Code, and the labour guarantee is written into the quote. A handover is signed with you, snags are noted and cleared before the final invoice. See the prices
Does 6 % VAT apply to my renovation?
Yes if the home is over 10 years old, used as a private dwelling and the invoice is addressed to a private individual; the works must concern the building itself, which is the case for plumbing, electrics, plastering, floors and painting. Fitted kitchen or bathroom furniture stays at 21 %. The quote states the rate line by line. Request a quote
What should I prepare before the survey and before the works?
For the survey: your ideas, inspiration photos if you have any, and access to all rooms involved as well as the meter and the consumer unit. Before the works: empty the rooms, protect what stays, inform neighbours and the building manager if you are in a co-owned building. We take care of floor protection and waste removal. See the prices
Do you also handle small urgent repairs during a renovation?
Yes, that is the point of a team that practises all 8 trades: a leak found during demolition, a consumer unit to make safe, a pane broken by rubble are handled within the same site, priced separately and without calling in another company. Emergencies outside the site are taken at the repair rate, with the evening or weekend surcharge stated on the phone. Request a quote
Complete bathroom (fittings, tiling, plumbing) in Uccle: how much does it cost?
The Belgian market in 2026 sits between €5000 and €20000 excluding VAT for complete bathroom (fittings, tiling, plumbing), night and weekend surcharges excluded. This is not our own rate card: your exact amount is announced on the phone before the technician leaves for Uccle, and the invoice separates call-out, labour and parts. See the prices
Do you really cover Uccle (1180)?
Yes. Uccle is in our area, Région de Bruxelles-Capitale included. The nearest municipality we also cover is Forest, 1.4 km away. The slot is confirmed by phone before the technician leaves. Request a quote
06 — Prices

Indicative Belgian market prices

The ranges the market charges in 2026, published as they are. Your exact price for Uccle is stated before the call-out.

Light renovation (painting, floors, finishes)
€300 – 800 excl. VAT / m²€318 – 848 incl. 6 % VAT · €363 – 968 incl. 21 % VAT
Medium renovation (kitchen, bathroom, plumbing)
€800 – 1500 excl. VAT / m²€848 – 1590 incl. 6 % VAT · €968 – 1815 incl. 21 % VAT
Heavy renovation (structure, insulation, electrics)
€1500 – 2500 excl. VAT / m²€1590 – 2650 incl. 6 % VAT · €1815 – 3025 incl. 21 % VAT
Complete bathroom (fittings, tiling, plumbing)
€5000 – 20000 excl. VAT flat rate€5300 – 21200 incl. 6 % VAT · €6050 – 24200 incl. 21 % VAT
Partition demolition, removal includedexcl. parts
€500 – 1500 excl. VAT flat rate€530 – 1590 incl. 6 % VAT · €605 – 1815 incl. 21 % VAT
Opening a load-bearing wall with steel beam
€1500 – 4000 excl. VAT flat rate€1590 – 4240 incl. 6 % VAT · €1815 – 4840 incl. 21 % VAT
Stud-and-board partition, finished
€35 – 65 excl. VAT / m²€37 – 69 incl. 6 % VAT · €42 – 79 incl. 21 % VAT
Re-plastering in renovation, Brussels
€18 – 28 excl. VAT / m²€19 – 30 incl. 6 % VAT · €22 – 34 incl. 21 % VAT
Traditional or self-levelling screed
€20 – 45 excl. VAT / m²€21 – 48 incl. 6 % VAT · €24 – 54 incl. 21 % VAT
Porcelain tiling, laid
€40 – 120 excl. VAT / m²€42 – 127 incl. 6 % VAT · €48 – 145 incl. 21 % VAT
Laminate flooring, floating
€25 – 55 excl. VAT / m²€26 – 58 incl. 6 % VAT · €30 – 67 incl. 21 % VAT
Painting walls and ceilings, 2 coats, preparation included
€15 – 45 excl. VAT / m²€16 – 48 incl. 6 % VAT · €18 – 54 incl. 21 % VAT
Interior door, supplied and fitted
€250 – 800 excl. VAT / item€265 – 848 incl. 6 % VAT · €302 – 968 incl. 21 % VAT
Surcharge
Works scheduled in working hours; urgent call-out in the evening or at the weekend: +50 to 100 % on labour

2026 Belgian market ranges in euros excluding VAT, taken from public comparison sites; this is not our price list: your quote is drawn up item by item after an on-site survey.

Sources

07 — Commitment

What will never appear on your invoice

The number one complaint about repair firms is the line nobody saw coming. Here are the ones we rule out.

Document · Commitment

  • 01No variation that was not priced and accepted in writing before the corresponding work.
  • 02No "renovation lump sum" item without quantity or unit price.
  • 03No deposit for a stage not yet started, apart from materials ordered for you.
  • 04No unknown subcontractor on your site: the team that priced the job is the one that does it.
Signed: FUSE SOLUTIONS SRL · VAT BE 1027.949.184
Contact

A quote for Uccle? Call us.

Describe the situation in three fields. We come back to you with a slot and a price for Uccle.

Price stated before the call-out[email protected]

Request a call-out

3 fields · 20 seconds

Your need

Your details

Prefer the phone?
02 886 08 80
HomeServicesCall02 886 08 80PricesQuote